Inspection-Report_TFSAFE_Full_KFAB22_Oiltown-NIPR-120-208_116_06-06-26_0
CompleteReport Details
- TAG-ID
- TFSAFE_KFAB22_Oiltown-NIPR-120-208_116_06-06-26_0
- Work Order
- TFS-KFAB22-2026-00007
- Site
- KFAB (Jordan) (KFAB22)
- Building
- Oiltown-NIPR-120-208
- Building Type
- CDP
- System Voltage
- 120/208
- Code Standard
- NEC
Inspection Info
- Phase
- Full Inspection
- Date
- 06-JUN-2026
- Team
- 116
- Overall Rating
- Fair
- Location
- Oiltown is adjacent to the airfield, north of Dufftown. The NIPR office is within Oiltown. The NIPR 120-208 CDP is within the NIPR office.
Summary of Findings
1x CDP. All cables. GFCI breakers feeding all circuits are functional.
Building Picture
Deficiencies (0)
No deficiencies recorded yet.
Signatures & QC
Inspector 1: Salomon Munoz
Inspector 2: Jongi Ledbetter
QC: David Forbes (approved 08-JUN-2026)
Status History
2
| Date | From | To | Changed By | Notes |
|---|---|---|---|---|
| 08-JUN-2026 | Pending QC | QC Approved | David Forbes | |
| 06-JUN-2026 | Draft | Pending QC | Salomon Munoz |