Report Details

TAG-ID
TFSAFE_ALQ26_SDP-2-2-E_113_11-06-26_1-8
Work Order
TFS-ALQ26-2026-00009
Site
Al Quwayrah (ALQ26)
Building
SDP-2-2-E
Building Type
SDP
System Voltage
230/400
Code Standard
British Standard

Inspection Info

Phase
Full Inspection
Date
11-JUN-2026
Team
113
Overall Rating
Poor
Location
Located opposite water tanks on the northeast perimeter, within LSS food prep area.

Summary of Findings

x 1 SDP. x 630A MCCB. x 6 63A 3P MCCB's. x 2 63A 1P MCCB's. x 1 60A 1P MCCB. All cabling, terminations and earthing arrangements. Multiple outgoing circuits have not been crimped to MCCB's. Earth path is by way of steel wire armouring. Ze readings are high but still within the maximum permitted tolerance of 0.8 Ohms.

Building Picture

Building photo

Deficiencies (8)

Deficiency #1 RAC 2 Open

Location: Opposite water tanks, northeast perimeter.

Category: Unlisted Equipment

Equipment: SDP

Occurrences: 1

Imminent Danger: No

Code Source: British Standard

Code Reference: 511: Compliance with standards

Action Taken: N/A

SOR Issued To: O&M Provider

Description: SDP-2-2-E is unlisted.

Deficiency photo
Deficiency #2 RAC 2 Open

Location: Bottom of SDP.

Category: Improper Use / Damaged

Equipment: SDP

Occurrences: 10

Imminent Danger: No

Code Source: British Standard

Code Reference: 522: Selection and erection of wiring systems in relation to external influences

Action Taken: N/A

SOR Issued To: O&M Provider

Description: Unused openings are compromising the integrity of IP rating.

Deficiency photo
Deficiency #3 RAC 2 Open

Location: Within SDP.

Category: Grounding and Bonding

Equipment: SDP

Occurrences: 1

Imminent Danger: No

Code Source: British Standard

Code Reference: 542: Earthing arrangements

Action Taken: N/A

SOR Issued To: O&M Provider

Description: No supplementary bond present to door.

Deficiency photo
Deficiency #4 RAC 2 Open

Location: Within SDP.

Category: Improper Use / Damaged

Equipment: SDP

Occurrences: 1

Imminent Danger: No

Code Source: British Standard

Code Reference: 132: Protection against electric shock

Action Taken: N/A

SOR Issued To: O&M Provider

Description: No dead front within SDP. Access requires the use of a key or a tool.

Deficiency photo
Deficiency #5 RAC 2 Open

Location: Within SDP.

Category: Improper Use / Damaged

Equipment: SDP

Occurrences: 8

Imminent Danger: No

Code Source: British Standard

Code Reference: Appx 4: Current carrying capacities and voltage drop for cables

Action Taken: N/A

SOR Issued To: O&M Provider

Description: Circuit 1/TP and 2/TP - 4mm2 conductors fed from 63A MCCB's. Circuit 3/TP, 4/TP, 6/TP and 9/TP - 10mm2 conductors fed from 63A MCCB's. Circuit 5/L1 and 7/L2 - 2.5mm2 conductors fed from 63A MCCB's.

Deficiency photo
Deficiency #6 RAC 2 Open

Location: Within SDP.

Category: Grounding and Bonding

Equipment: SDP

Occurrences: 1

Imminent Danger: No

Code Source: British Standard

Code Reference: 542: Earthing arrangements

Action Taken: N/A

SOR Issued To: O&M Provider

Description: Main supply has not been glanded.

Deficiency photo
Deficiency #7 RAC 2 Open

Location: Within SDP, circuit 5/L1 and 7/L2.

Category: Improper Terminations

Equipment: SDP

Occurrences: 4

Imminent Danger: No

Code Source: British Standard

Code Reference: 526: Electrical connections

Action Taken: N/A

SOR Issued To: O&M Provider

Description: CPC and neutral conductors have been wrapped around the neutral and MET bars to form a connection.

Deficiency photo
Deficiency #8 RAC 1 Closed / Repaired ⚠ IMMINENT DANGER

Location: Within SDP, circuit 7/L3.

Category: Poor Workmanship

Equipment: SDP

Occurrences: 1

Imminent Danger: Yes

Code Source: British Standard

Code Reference: 510: Common rules

Action Taken: Circuit 7/L3 isolated and ends made safe.

SOR Issued To: Task Force SAFE

Description: Redundant outgoing circuit has live bare ends left exposed. TF Safe made safe on the spot.

Deficiency photo

Signatures & QC

Inspector 1: Jon Sharp

Inspector 2: Giles Vincent-Edwards

QC: David Forbes (approved 12-JUN-2026)

Status History

4
DateFromToChanged ByNotes
12-JUN-2026Pending QCQC ApprovedDavid Forbes
12-JUN-2026QC RejectedPending QCJonathan Sharp
11-JUN-2026Pending QCQC RejectedDavid ForbesDef 5; Occurrences 9 Description only has 8 circuits listed
11-JUN-2026DraftPending QCJonathan Sharp