Inspection-Report_TFSAFE_Full_ALQ26_ATS-N_113_03-06-26_1
CompleteReport Details
- TAG-ID
- TFSAFE_ALQ26_ATS-N_113_03-06-26_1
- Work Order
- TFS-ALQ26-2026-00002
- Site
- Al Quwayrah (ALQ26)
- Building
- ATS-N
- Building Type
- ATS
- System Voltage
- 230/400
- Code Standard
- British Standard
Inspection Info
- Phase
- Full Inspection
- Date
- 03-JUN-2026
- Team
- 113
- Overall Rating
- Fair
- Location
- North perimeter rear of DFAC.
Summary of Findings
All cabling, terminations and earthing arrangements inspected. Note: 3-phase 4-wire parallel supply within ATS from GEN-1. The Neutral/earth link installed within GEN-1 is for the GEC at MET. GEN-2 is a 3-phase 4-wire parallel with a single core CPC bypassing the ATS going directly to the MDP.
Building Picture
Deficiencies (1)
Deficiency #1 RAC 2 Open
Location: ATS door
Category: Improper Use / Damaged
Equipment: ATS
Occurrences: 1
Imminent Danger: No
Code Source: British Standard
Code Reference: 642: Inspection
Action Taken: N/A
SOR Issued To: O&M Provider
Description: A crowbar has been wedged against the door to keep it closed as the door locking mechanism is damaged.
Signatures & QC
Inspector 1: Giles Edwards
Inspector 2: Jon Sharp
QC: David Forbes (approved 04-JUN-2026)
Status History
2
| Date | From | To | Changed By | Notes |
|---|---|---|---|---|
| 04-JUN-2026 | Pending QC | QC Approved | David Forbes | |
| 03-JUN-2026 | Draft | Pending QC | - |

