Report Details

TAG-ID
TFSAFE_ALQ26_MDP-N_113_04-06-26_1-2
Work Order
TFS-ALQ26-2026-00003
Site
Al Quwayrah (ALQ26)
Building
MDP-N
Building Type
MDP
System Voltage
230/400
Code Standard
British Standard

Inspection Info

Phase
Full Inspection
Date
04-JUN-2026
Team
113
Overall Rating
Fair
Location
MDP is located on the north perimeter, rear of DFAC.

Summary of Findings

Cabinet 1 - x 1, 250A MCCB, x 1, 125A MCCB. Cabinet 2 - x 1, 1600A MCCB. Cabinet 3 - x 1, 400A MCCB, x 1, 250A MCCB. All cabling, terminations and earthing arrangements inspected. Earth tags for SWA glands are not present but testing readings are well within range.

Building Picture

Building photo

Deficiencies (2)

Deficiency #1 RAC 2 Open

Location: Within MDP.

Category: Grounding and Bonding

Equipment: MDP

Occurrences: 1

Imminent Danger: No

Code Source: British Standard

Code Reference: 542: Earthing arrangements

Action Taken: N/A

SOR Issued To: O&M Provider

Description: Neutral earth link is not terminated to the MET.

Deficiency photo
Deficiency #2 RAC 2 Open

Location: Within MDP.

Category: Grounding and Bonding

Equipment: MDP

Occurrences: 1

Imminent Danger: No

Code Source: British Standard

Code Reference: 542: Earthing arrangements

Action Taken: N/A

SOR Issued To: O&M Provider

Description: Neutral earth link is undersized at 95mm2. Incoming supply is 300mm2 single core conductors in parallel.

Deficiency photo

Signatures & QC

Inspector 1: Giles Edwards

Inspector 2: Jon Sharp

QC: David Forbes (approved 05-JUN-2026)

Status History

2
DateFromToChanged ByNotes
05-JUN-2026Pending QCQC ApprovedDavid Forbes
04-JUN-2026DraftPending QCGiles Vincent-Edwards