Inspection-Report_TFSAFE_Full_ALQ26_MDP-N_113_04-06-26_1-2
CompleteReport Details
- TAG-ID
- TFSAFE_ALQ26_MDP-N_113_04-06-26_1-2
- Work Order
- TFS-ALQ26-2026-00003
- Site
- Al Quwayrah (ALQ26)
- Building
- MDP-N
- Building Type
- MDP
- System Voltage
- 230/400
- Code Standard
- British Standard
Inspection Info
- Phase
- Full Inspection
- Date
- 04-JUN-2026
- Team
- 113
- Overall Rating
- Fair
- Location
- MDP is located on the north perimeter, rear of DFAC.
Summary of Findings
Cabinet 1 - x 1, 250A MCCB, x 1, 125A MCCB. Cabinet 2 - x 1, 1600A MCCB. Cabinet 3 - x 1, 400A MCCB, x 1, 250A MCCB. All cabling, terminations and earthing arrangements inspected. Earth tags for SWA glands are not present but testing readings are well within range.
Building Picture
Deficiencies (2)
Location: Within MDP.
Category: Grounding and Bonding
Equipment: MDP
Occurrences: 1
Imminent Danger: No
Code Source: British Standard
Code Reference: 542: Earthing arrangements
Action Taken: N/A
SOR Issued To: O&M Provider
Description: Neutral earth link is not terminated to the MET.
Location: Within MDP.
Category: Grounding and Bonding
Equipment: MDP
Occurrences: 1
Imminent Danger: No
Code Source: British Standard
Code Reference: 542: Earthing arrangements
Action Taken: N/A
SOR Issued To: O&M Provider
Description: Neutral earth link is undersized at 95mm2. Incoming supply is 300mm2 single core conductors in parallel.
Signatures & QC
Inspector 1: Giles Edwards
Inspector 2: Jon Sharp
QC: David Forbes (approved 05-JUN-2026)
Status History
2
| Date | From | To | Changed By | Notes |
|---|---|---|---|---|
| 05-JUN-2026 | Pending QC | QC Approved | David Forbes | |
| 04-JUN-2026 | Draft | Pending QC | Giles Vincent-Edwards |