Report Details

TAG-ID
TFSAFE_ALQ26_ATS-W_113_22-06-26
Work Order
TFS-ALQ26-2026-00018
Site
Al Quwayrah (ALQ26)
Building
ATS-W
Building Type
ATS
System Voltage
230/400
Code Standard
British Standard

Inspection Info

Phase
Full Inspection
Date
22-JUN-2026
Team
113
Overall Rating
Fair
Location
Located on the western perimeter within gen-pad.

Summary of Findings

x 1 ATS. All cabling, terminations, and earthing arrangements. Single core conductors run separately through a ferrous gland plate. The risk of eddy currents generating excessive heat is deemed to be negligible after load test. Neutral/earth link is located in the MDP.

Building Picture

Building photo

Deficiencies (2)

Deficiency #1 RAC 2 Open

Location: ATS.

Category: Improper Use / Damaged

Equipment: ATS

Occurrences: 1

Imminent Danger: No

Code Source: British Standard

Code Reference: 642: Inspection

Action Taken: N/A

SOR Issued To: O&M Provider

Description: Locking mechanism to door is damaged. ATS is located within the gen-pad and is fenced off and locked, restricting access.

Deficiency photo
Deficiency #2 RAC 2 Open

Location: Within ATS, lower left incoming supply.

Category: Improper Use / Damaged

Equipment: ATS

Occurrences: 1

Imminent Danger: No

Code Source: British Standard

Code Reference: 132: Protection against electric shock

Action Taken: N/A

SOR Issued To: O&M Provider

Description: Dead front missing. ATS is located within the gen-pad and is fenced off and locked, restricting access.

Deficiency photo

Signatures & QC

Inspector 1: Jon Sharp (signed 2026-06-23)

Inspector 2: Giles Vincent-Edwards (signed 2026-06-23)

Previously rejected 1 timeView rejection history

Status History

3
DateFromToChanged ByNotes
23-JUN-2026QC RejectedPending QCJonathan Sharp
22-JUN-2026Pending QCQC RejectedDavid ForbesBuilding image missing from report
22-JUN-2026DraftPending QCJonathan Sharp
Back to Work OrderAll Reports