Inspection-Report_TFSAFE_Full_7NX32_Hangar-RM-3-CDP_128_19-06-26_1-2
QC RejectedReport Details
- TAG-ID
- TFSAFE_7NX32_Hangar-RM-3-CDP_128_19-06-26
- Work Order
- TFS-7NX32-2026-00009
- Site
- H-5 (Jordan) (7NX32)
- Building
- Hangar-RM-3-CDP
- Building Type
- CDP
- System Voltage
- 230/400
- Code Standard
- British Standard
Inspection Info
- Phase
- Full Inspection
- Date
- 19-JUN-2026
- Team
- 128
- Overall Rating
- Fair
- Location
- Hangar is located adjacent to the flightline.
Summary of Findings
No LHS issues were found at time of inspection, RM 3 CDP inspected.
Building Picture
Update Report
Deficiencies (2)
Location: RCD within the CDP..
Category: Improper Use / Damaged
Equipment: CDP
Occurrences: 1
Imminent Danger: No
Code Source: British Standard
Code Reference: 526: Electrical connections
Action Taken: N/A
SOR Issued To: O&M Provider
Description: Live and neutral have not been terminated in the correct terminals of the RCD as per manufacturer's instructions.
Location: RCD within the CDP..
Category: Improper Use / Damaged
Equipment: CDP
Occurrences: 1
Imminent Danger: No
Code Source: British Standard
Code Reference: 132: Protection against electric shock
Action Taken: N/A
SOR Issued To: O&M Provider
Description: There is a type AC RCD installed within the CDP.
Signatures & QC
Comments: Good afternoon gents, Please see below for items requiring attention: 1. Building location – please provide more information; where is room 3 within the hangar 2. Summary says no LHS issues were found but the report has 2 deficiencies 3. Def 1 and 2 – Typo – extra full stop in the location description 4. Def 1 and 2 – Both deficiencies were closed on re-inspection-1 25-Feb-26; unless these issues are still present they should be removed from this report 5. Re-inspection-1 has an open deficiency (Def 3) this should be included on this report If you have any questions, please give me a call
Please address the issues above and resubmit.
Status History
2
| Date | From | To | Changed By | Notes |
|---|---|---|---|---|
| 20-JUN-2026 | Pending QC | QC Rejected | Hugh Crawford | Good afternoon gents, Please see below for items requiring attention: 1. Building location – please provide more information; where is room 3 within the hangar 2. Summary says no LHS issues were found but the report has 2 deficiencies 3. Def 1 and 2 – Typo – extra full stop in the location description 4. Def 1 and 2 – Both deficiencies were closed on re-inspection-1 25-Feb-26; unless these issues are still present they should be removed from this report 5. Re-inspection-1 has an open deficiency (Def 3) this should be included on this report If you have any questions, please give me a call |
| 19-JUN-2026 | Draft | Pending QC | Andrew McLean |