⚠ QC Rejected by Hugh Crawford
View Full History
Latest Comments: Good afternoon gents,
Please see items below which require attention:
1. Building location – change comma at end of description to a full stop
2. Def 2 – description refers to the summary page but this report does not have a summary page: remove reference to summary or add a summary
3. Def 2 and 3 – these deficiencies were closed on a reinspection report in February: were they still present during this inspection, if not then they can be removed from this report
If you have any questions, please give me a call

Report Details

TAG-ID
TFSAFE_7NX32_Hangar-RM-1-CDP_128_18-06-26
Work Order
TFS-7NX32-2026-00007
Site
H-5 (Jordan) (7NX32)
Building
Hangar-RM-1-CDP
Building Type
HANGAR
System Voltage
230/400
Code Standard
British Standard

Inspection Info

Phase
Full Inspection
Date
18-JUN-2026
Team
128
Overall Rating
Fair
Location
Hangar is located adjacent to the flightline. Rm-1 FSR office is located on right side of building as entered from the car park on the west wall.

Summary of Findings

No LHS found at time of inspection, Room 1 CDP inspected.

Building Picture

Building photo

Update Report

Deficiencies (1)

Deficiency #1 RAC 2 Closed / Repaired
Edit

Location: RCD within the CDP.

Category: Improper Terminations

Equipment: CDP

Occurrences: 1

Imminent Danger: No

Code Source: British Standard

Code Reference: 526: Electrical connections

Action Taken: N/A

SOR Issued To: O&M Provider

Description: Live and neutral have not been terminated in the correct terminals of the RCD as per manufactured instructions.

Deficiency photo

Signatures & QC

QC Rejected by: Hugh Crawford (Rejection #1)

Comments: Good afternoon gents, Please see items below which require attention: 1. Building location – change comma at end of description to a full stop 2. Def 2 – description refers to the summary page but this report does not have a summary page: remove reference to summary or add a summary 3. Def 2 and 3 – these deficiencies were closed on a reinspection report in February: were they still present during this inspection, if not then they can be removed from this report If you have any questions, please give me a call

Please address the issues above and resubmit.


Status History

2
DateFromToChanged ByNotes
19-JUN-2026Pending QCQC RejectedHugh CrawfordGood afternoon gents, Please see items below which require attention: 1. Building location – change comma at end of description to a full stop 2. Def 2 – description refers to the summary page but this report does not have a summary page: remove reference to summary or add a summary 3. Def 2 and 3 – these deficiencies were closed on a reinspection report in February: were they still present during this inspection, if not then they can be removed from this report If you have any questions, please give me a call
18-JUN-2026DraftPending QCBrett Smithson